Heavy Haulage Swamp Dredging
Elysora Heavy Haulage & Industrial Infrastructure

Industrial Infrastructure &
Terrain Transformation

Precision engineering and heavy machinery deployment: deep swamp reclamation, mass sandfilling, heavy equipment lowbed haulage, and site preparation for Nigeria's largest infrastructure projects.

Operational Status
ALL FLEETS ACTIVE
1.2M m³Sandfilled Volume
150TMax Lowbed Cap
36/36Nigerian States Covered
99.8%On-Time Escort
Licensed by Federal Ministry of Transportation & NIMASA Compliant.
Operational Assets

Heavy Machinery & Transport Fleet

Our company-owned heavy equipment operates with telematics tracking, certified operators, and 24/7 technical field maintenance units.

Heavy Tonnage Lowbed Transporters
Heavy HaulageOperational
80 - 150 Tons

Heavy Tonnage Lowbed Transporters

Engineered for long-distance transport of super-heavy transformers, excavators, industrial cranes, and oil & gas pipeline rigs across all Nigerian states.

Hydraulic Gooseneck
Extendable Deck
Air Suspension System
Escort Support Integrated
Capacity: Multi-Axle Heavy MachineryMobilize Unit
Amphibious Swamp Excavators (Cat 320/330)
Terrain TransformationDeployed
35 Tons

Amphibious Swamp Excavators (Cat 320/330)

Specialized for marshland reclamation, coastal canal dredging, and deep swamp preparation in Lekki, Epe, and Niger Delta project sites.

Pontoon Track System
Extended Boom Reach
Zero Ground Pressure
High Tidal Resistance
Capacity: Deep Swamp Dredging & ClearingMobilize Unit
30-40 Ton Heavy Earthmoving Dumpers
Earth MovingOperational
40 Tons

30-40 Ton Heavy Earthmoving Dumpers

Continuous day-and-night aggregate haulage for estate road foundations, sandfilling, and heavy construction sites with rapid cycle times.

Reinforced Hardox Steel Body
All-Terrain 8x4 Drive
Telematics Live Tracking
Rapid Discharge Cycle
Capacity: High-Volume Sand & Granite HaulMobilize Unit
Caterpillar D8R Heavy Bulldozers & Graders
Terrain TransformationOperational
38 Tons

Caterpillar D8R Heavy Bulldozers & Graders

Primary site preparation, high-density forest clearing, rough cutting, and access road grading for industrial parks and residential mega-estates.

Semi-U Blade
Single Shank Ripper
High-Torque Turbo
Laser Grading Compatible
Capacity: Mass Earth Levelling & Road CuttingMobilize Unit
Track Record of Excellence

Major Infrastructure Contracts

Completed8 Months

Lekki Coastal Corridor Swamp Reclamation

Ibeju-Lekki, Lagos
Scope: 120 Hectares Swamp Excavation & Sandfill
Volume: 1,200,000 m³ Sand Filled
Client: Commercial Real Estate Mega-Estate
Completed6 Months

Epe Highway Expansion Heavy Aggregates Logistics

Epe-Ijebu Corridor
Scope: Granite & Sharp Sand Haulage
Volume: 450,000 Metric Tons
Client: Infrastructure Contractor
Completed45 Days

Free Trade Zone Heavy Plant Relocation

Lekki FTZ Perimeter
Scope: Multi-Axle Specialized Heavy Haulage
Volume: 3,500 Tons Equipment Moved
Client: Industrial Manufacturing Consortium
Rapid Logistics Dispatch

Request Heavy Haulage / Reclamation Quote

Receive a binding freight logistics proposal with route clearance assessment within 4 operational hours.